Kendrick Court

This building was constructed in the late 1980s but not fitted out internally until recently. It was discovered that many of the existing wall ties were not connected to the outer skin of masonry.

5000 Helifix dry fix ties were installed internally to ensure stability of the structure.

The building works were completed and the flats are now occupied.

This project was carried out in association with Helifix Ltd whose specialists oversaw the technical requirements of the project.

  • 5000 DryFix Remedial Wall Ties Installed at Low Cost.
  • Quick, Easy, Tested Solution.
  • Engineers Evaluated Poor Building – Insufficient Ties.
  • Brand New Buildings Unused for 10 Years.
  • 25 Year Remedial Wall Tie Warranty.
  • Installed From Inside of Property.